System Project Management (design and develop an online application for a college with two interfaces)

System Project Management (design and develop an online application for a college with two interfaces)

Read the following case study carefully and analyze the situation:

Assume that you are going to design and develop an online application for a college with two interfaces, one mainly for the college management to deal with administration, registration, other related matters and the other will be used by student. The interface requirements may keep on changing and team has to work with multiple versions. The development team has to deploy the proposed application considering all requirement changes.

The major requirements of the system are

Provide comprehensive course details.

  • Detailed semester categorization and module registration
  • • Maintain student profile

  • Email confirmation of all activities to students
  • Provide online result and query facility
  • Provide multiple payment methods for payment of fees
  • prepare a document which defines all major aspects of the project and forms the foundation for project management. This document can also be used as an assessment of overall project success. It MUST include the following:

    1

    1. Introduction

    2

    2. Problem Definition

    3

    Scope

    4

    4. Requirement Specification

    4.1 Functional Requirement

    4.2 Resource Requirement

    4.3 Quality Requirement

    5

    Project methodology (DSDM, PRINCE2, AGILE, SCRUM etc.)

    Explain One of the above methodology and compare between one and with diagram.

    6

    Risk Identification and Mitigation plan (three categories with two risks in each categories. (Total six risks)).

    7

    Resource Plan (All Resources)

    8

    Costing Plan/Estimation plan (should include all types of overheads) We need this in table.(Hardware and software and People)

    9

    Project Scheduling using MS project (Project Start Date 03 June 2018) 9.1 Task List with predecessor linking

    9.2 Gantt Chart

    9.3 Resource Allocations (Only Human Resources)

    9.6 Network Diagrams

    10

    Acceptance Plan (this should include the criteria which will be used by the management to check project completion and implementation)

    11

    Training Plan

    12

    Conclusion and References

    * 0 % similarity

    *references and citation is required( Article. Books and conference paper)

    * total page of assignment is 10-15 pages

    * kindly use the easy language.

    *harvard style referencing

    "You need a similar assignment done from scratch? Our qualified writers will help you with a guaranteed AI-free & plagiarism-free A+ quality paper, Confidentiality, Timely delivery & Livechat/phone Support.


    Discount Code: CIPD30



    Click ORDER NOW..

    order custom paper