identify suitable methods for managing each potential pollutant. You need to justify your decisions
identify suitable methods for managing each potential pollutant. You need to justify your decisions
Scenario: You are employed as an Environmental Health Officer (EHO) / Environmental ProtectionOfficer with a local government. The Council receives a development application, associated plansand the relevant application fee for a proposed concrete batching plant. The proposed concretebatching plant is code assessable development under the local government’s planning schemeand Council is the Assessment Manager. The Town Planner refers the application to you forassessment of the potential environmental impacts.The operation of the proposed concrete batching plant will include:• An office building which will include an office, staff lunch room, shower and toilet facilities, etc.• External washing of the trucks. This will be carried out in the truck parking area. Any minormechanical repair works of the trucks will also be carried out in this area.• A front-end loader will move the product from the aggregate bins to the hopper. A conveyorsystem will then be used to transfer the material to the chute.• All equipment and chemicals used during the operation of the facility will be stored in thestorage area.• A minor refuelling area with an above ground 2000L, diesel storage tank and bowser may beprovided at a later date.The application also notes that the concrete batching plant will operate from 6am to 6pm Mondayto Saturday and 6am to 4pm on Sundays and public holidays. The application also states thatsome excavation work, specifically some cut and fill work of the site may be required.There are two (2) neighbouring properties to the site. To the north there is a road, to the souththere is a storage facility (i.e. industrial sheds which people use for long-term storage of items).The land to the east is currently vacant and can only be used for heavy industry in the future. Tothe west there is a nature reserve/wetland area. The proposed buildings will be approximately3.5km from the nearest residential building.The main access to the site is via Sawmill Road (a State-controlled road). Two (2) entry/exit pointsalready exist and were approved by the Department of Main Roads several years ago.You are required to assess the potential environmental impacts associated with the concretebatching plant. Your detailed assessment will consider potential air, water and land pollutants;environmental noise, and other environmental protection / management issues. After identifyingthe sources of potential pollutants, their characteristics and potential impacts, you are required toidentify suitable methods for managing each potential pollutant. You need to justify your decisionsin the context of the principles of environmental protection and sustainable development, andrelevant legislation.You then need to develop approval conditions (attach as an appendix) which would ensuregovernment agencies would have the legal power to control all potential pollutants.You are then required to write a report which should detail the process you undertook to identifythe potential environmental impacts and appropriate management strategies, your findings inrelation to the application and plans, and an explanation of the draft conditions.The report must conform to normal academic requirements and must be correctly referenced. Itshould be logically structured and the use of headings and sub-headings, diagrams, tables andappendices is encouraged.The report should include, but not be limited to, the following topics:• Introduction (including the purpose of assessing the environmental impacts of proposeddevelopments).• Body of the report with appropriate headings and sub-headings including: Methodology (i.e. the process you undertook to assess the application and plans); Potential pollution issues; Legislative requirements associated with the identified issues; If you would require any additional information from the applicants; A discussion regarding the suitability of the proposed transfer station in relation tolegislative requirements; and Recommendations including the draft conditions you would place on the approval if issued.• Conclusion• Reference list• AppendicesYou will need to reference all relevant sections in each piece of legislation you refer to in yourreport. Whilst you may wish to mention relevant building and plumbing legislation, you are notrequired to consider the application under this legislation and should not discuss this legislation inthe report.Note: if you require further information, you are to assume you receive that information and canthen proceed with assessing the application (please note the information requested and theassumed response in your report or in an appendix to your report).The information provided in the unit materials, readings and lectures should be expanded throughyour independent research, and used to support statements and explanations in the report.Additional information provided in the application:• All areas where traffic (staff cars and trucks) will move will be sealed with bitumen or concrete.• All unsealed areas (i.e. areas with no buildings or traffic movement) will be revegetated.• An industrial bin will be used to store waste and any other recyclable materials. The bin will belocated outside of the property boundary.• The stormwater on site will go through an appropriate stormwater storage tank beforedischarging to stormwater. The system has been engineered correctly.• A Hazchem spill kit will be located on site.• Any future refuelling areas will comply with AS1940.• No external loud speaker systems will be used on site. There is an external alarm system usedto warn staff to leave the site and gather in the emergency area in case of an emergency onsite.• The site will be secured at night and a security patrol company will be hired to monitor securityon the premises.• Sand and aggregate stockpiles will be watered to keep down dust emissions.• Silos are to be fitted with overfill protection and dust filtration systems
"You need a similar assignment done from scratch? Our qualified writers will help you with a guaranteed AI-free & plagiarism-free A+ quality paper, Confidentiality, Timely delivery & Livechat/phone Support.
Discount Code: CIPD30
Click ORDER NOW..
