I have design layout, i need two page about layout manufacturing how many offices and machines. what is the distance of area take
I have design layout, i need two page about layout manufacturing how many offices and machines. what is the distance of area take
What you should be working on:
Things to think about for Receiving Area:
- Truck parking and maneuvering space outside of the plant wall (up to 65 feet for parking, 45 feet for maneuvering)
- Dock design – doors, connection to truck if needed (dock plates, dock levelers, and dock boards)
- Office space for receiving personnel (100 square feet per clerk)
- Forklift or unloading equipment space
- Space for storage of incoming materials (two weeks of materials)
- Maneuvering space for unloading equipment while unloading
- Space for material handling equipment that transports material inside the plant
- Area to open, separate, count, and check quality
- Aisles
Things to think about for Shipping Area:
- Packaging (carton or containers) (pallets, stretch wrap machine)
- Weigh station
- Storage space (at least 2500 seats) (truck can hold 18 – 42” X 48” pallets)
- Forklift or loading equipment space
- Maneuvering space for loading equipment while loading
- Truck parking and maneuvering space outside of the plant wall (up to 65 feet for parking, 45 feet for maneuvering)
- Dock design – doors, connection to truck if needed (dock plates, dock levelers, and dock boards)
- Aisles
- Stretch Wrapping equipment
- Office space for shipping personnel (100 square feet per clerk)
Think about space needed for Maintenance and Tool Room (expendable supplies)
Think about space for a Mechanical room (Air compressor, sawdust collection system)
Employee services to think about: (Most based off number of employees)
- Parking Lot
- Employee entrance
- Restrooms
- Break area/lounge
- Drinking fountains
- Aisles (based on traffic and materials that need to be transported)
- Medical facilities (first aid)